Tustin Ranch Road extension from Walnut Ave to Warner Ave

TUSTIN RANCH ROAD

R.J. Noble was contracted by the City of Tustin to complete the bridge that would connect Tustin Ranch Road from Walnut Ave to Warner Ave.  We constructed a 400 ft bridge over Edinger, active railroad and a water channel.  Included in the project was the construction of approximately 2.5 miles of new roadway which is now Tustin Ranch Road.

MAR, 2014

Date Completed

$22.6M

Contract

New Construction

Job Type

City of La Mirada

CAPITAL IMPROVEMENTS

R.J. Noble was contracted by the City of La Mirada to complete phase 3 of their residential street rehabilitation projects.  The project includes removal and replacement of concrete improvements, installation of new storm drains, cold milling of the asphalt and installation of asphalt rubber hot mix throughout several of their residential streets.

OCT, 2017

Date Completed

$6.7M

Contract

Residential Overlay

Job Type

Caltrans - 91 Express Lanes

91 EXPRESS LANES

R.J. Noble partnered with Caltrans and OCTA to complete the removal and replacement of the asphalt of approximately 20 lane miles of Express Lanes on the 91 Freeway stretching from the 91/55 split to Green River Road in Corona. This job was completed 2 weekends ahead of schedule.

AUG, 2017

Date Completed

$12.2M

Contract

Grind & Overlay

Job Type

New Roadway between Oso & Cow Camp in San Juan Capistrano

LOS PATRONES PARKWAY IMPTS.

R.J. Noble was contracted by Rancho Mission Viejo to construct Los Patrones Parkway to provide efficient access to their new and future housing projects. When R.J. Noble’s crew have completed our work, Los Patrones will have two lanes in both directions for about 5 miles and a new bridge to give access at Chiquita Canyon. This project consists of a structural section that includes Cement Treat Soil, Class II Base, and Asphalt. We are also installing Natina Coated Fencing along the length of the project, plus a New Bridge, Signals & Electrical, Underground Storm Drains, JPCP, Concrete, Water Line Utilities, Water Retention Basins, Dry Utilities, Hydromulch, and Striping. We are proud to be part of a project that will benefit families for generations to come.

OCT, 2018

Date Completed

$23.3M

Contract

New Construction

Job Type